Skip to content

Orda News

Новости Казахстана

Menu
Menu

Part of Syganak Street to be Closed for Nine Months in Astana

Posted on 30/11/2024

Traffic on Syganak Street in Astana will be closed for nine months. The restrictions will be introduced on two sections of the street at once. Such measures were taken in connection with the construction of LRT pedestrian crossings, City Transportation Systems writes .

“In connection with the pile-driving works for the construction of LRT overground pedestrian crossings at stations No. 112–118, traffic will be completely restricted until September 1, 2025: along Syganak Street from Akmeshit Street to Turkestan Street; along the right-hand exit from Mangilik El Avenue onto Syganak Street towards Turkestan Street,” the statement said.

Astana residents and visitors are advised to plan their route in advance.

A section of this street was also previously closed due to LRT construction in April 2024.
Let us recall that in mid-November, the construction of the LRT depot began in the capital. The total area of the buildings will be about 80 thousand square meters. They will house all the necessary facilities for the maintenance and repair of rolling stock.

   

Subscribe to our Instagram

   

Cover: yandex cards

Leave a Reply Cancel reply

You must be logged in to post a comment.

Archives

  • May 2025
  • April 2025
  • March 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024

Categories

  • Новости

Recent Posts

  • В Киеве и области прогремели взрывы, столичный регион атакуют российские дроны
  • Извлекая сантиметры на поле боя, Россия требует километры на переговорах — The New York Times
  • Квартира в Киеве: как изменились цены
  • В Ватикане закрыли двери в Сикстинскую капеллу: конклав с избрания Папы официально начался
  • Это уже очень много, – Трамп оценил предложение Путина о трехдневном перемирии

Recent Comments

No comments to show.
©2025 Orda News | Design: Newspaperly WordPress Theme